Electric steam boiler for the paper mill – 4 MW power-to-heat
Paper Mill | Gmund am Tegernsee
The paper mill in Gmund am Tegernsee is achieving a medium-term transition of its steam generation energy supply to sustainable energy sources.
Project Highlights
4.0 MWel / 6.15 t/h steam at 10 bar
Power-to-heat – participation in the balancing energy market
72 h BoB – fully autonomous operation
Initial Situation
- The customer operates steam generators for direct process steam supply as well as for independent power generation via a steam turbine.
- In the medium term, the energy supply was to be switched to sustainable sources – the decision was made for an electric steam generator.
- With the new electric steam boiler as a power-to-heat system, participation in the market for negative balancing energy was also to be enabled.
The Solution from SCHNEIDER-KESSEL BERLIN®
An HDO-E 4000/10 electric steam generator for the production of superheated steam was planned, manufactured, delivered, and commissioned. The heating capacity of 4.0 MWel is provided by four resistance heating elements of 1,000 kW each. The system, including all fittings as well as the control and switchgear, was designed for 72-hour unsupervised operation. The scope of delivery included installation and commissioning.
Our Services
- Planning, manufacturing, delivery, installation, and commissioning of an HDO-E 4000/10 electric steam generator (4 × 1,000 kW)
- Generation of superheated steam for heating purposes and process requirements
- Control and switchgear for 72 h operation without supervision (BoB)
Inspired by this solution?
Learn more about our electric boilers
Electric steam boilers
Zero-emission steam generation using electric heating. Flexible and low-maintenance.
Positive Customer Benefits and Added Value
- Sustainable energy supply through fully electric operation with renewable electricity
- Balancing energy marketing through the system’s power-to-heat capability
- CO₂ reduction in the production process by moving away from fossil fuels
- Autonomous operation thanks to 72 h BoB – minimal personnel effort
- High availability through redundant heating elements (4 × 1,000 kW)
- Everything from a single source – planning, delivery, installation, and commissioning
- Made in Germany – quality from Berlin for German industry