Two high-pressure steam generators for the edible oil industry in Malaysia
Mewaholeo Sdn. Bhd. | Malaysia
Mewaholeo Sdn. Bhd. in Malaysia requires two high-pressure steam generators for process heat supply (deodorization) in a closed steam-condensate circuit.
Project Highlights
2 × 3.7 MW at 95 bar – high-pressure steam for deodorization
Boiler efficiency >91% thanks to integrated combustion air preheating (LuVo)
Dual-fuel firing: light fuel oil (EL) / natural gas H
Initial Situation
- A food industry company in Malaysia required two high-pressure steam generators for process heat supply (deodorization) in a closed steam-condensate loop.
- The overall plant was to be designed with a focus on achieving the highest possible efficiency.
The Solution from SCHNEIDER-KESSEL BERLIN®
Two natural circulation boilers of the iNook 3700/95 type in membrane wall design (tube-bar-tube technology) were manufactured and supplied. To achieve a boiler efficiency of over 91%, combustion air preheating (LuVo) was integrated. The Weishaupt dual-fuel firing system enables operation with light fuel oil (EL) and natural gas H. The switchgear and boiler equipment were designed for 72-hour operation without continuous supervision (BoB).
Our Services
- Engineering, manufacture and supply of 2 × natural circulation boilers iNook 3700/95 in membrane wall design (tube-bar-tube)
- Integrated combustion air preheating (LuVo) for efficiency >91%
- Weishaupt dual-fuel firing (light fuel oil EL / natural gas H); switchgear for 72 h BoB
Inspired by this solution?
Learn more about our water tube boilers
Water tube boiler
Compact, high-performance steam generator based on the natural circulation principle. Ideal for high-pressure and specialist applications.
Positive Customer Benefits and Added Value
- High-pressure steam at 95 bar for demanding deodorization processes
- Maximum energy efficiency through combustion air preheating – efficiency >91%
- Security of supply through redundant twin-boiler design
- Fuel flexibility through dual-fuel firing (light fuel oil EL / natural gas H)
- Robust membrane wall design for durability and tightness
- 72 h BoB for minimal staffing in continuous operation
- International engineering – delivery and service in Malaysia
Speak to Our Experts