Natural Circulation Boiler 95 bar – Upgrade for Edible Oil Thailand

Pathumthani Vegetable Oil | Thailand

As a replacement for a defective natural circulation boiler from another manufacturer, the company in the edible oil processing sector required the fastest possible boiler delivery, with a focus on the simplest and quickest installation and the reuse of existing equipment.

Project Highlights

2.3 MW at 95 bar – Design upgrade to membrane wall construction

Structural adaptation to existing connections

Assembly supervision and commissioning included

Initial Situation

  • The fastest possible boiler delivery was required as a replacement for a defective natural circulation boiler from another manufacturer.
  • Priority: simplest and fastest assembly with maximum reuse of existing equipment.

The Solution from SCHNEIDER-KESSEL BERLIN®

A natural circulation boiler of type iNook 2300/95 was supplied in modern membrane wall construction (tube-fin-tube technology) as a design and safety upgrade compared to the outdated tube-on-tube design of the existing boiler. Steam and condensate nozzles as well as the chimney connection were structurally adapted precisely to the existing connection conditions. The delivery included assembly supervision and on-site commissioning.

Our Services

  • Planning, manufacturing, and delivery of an iNook 2300/95 natural circulation boiler in membrane wall construction as an upgrade to the tube-on-tube design
  • Individual structural adaptation of all nozzles and the chimney connection to existing connections
  • Assembly supervision and on-site commissioning (Thailand)

Inspired by this solution?

Learn more about our water tube boiler

Water tube boiler

Compact, high-performance steam generator based on the natural circulation principle. Ideal for high-pressure and specialist applications.
WRK-HP | Product | Schneider Kessel Berlin

Positive Customer Benefits and Added Value

  • Fastest availability through rapid production and delivery to Thailand
  • Minimal conversion effort through individual adaptation to existing connections
  • Technical upgrade from outdated tube-on-tube to safe membrane wall construction
  • High-pressure operation at 95 bar for demanding processes
  • Assembly supervision included for smooth commissioning
  • Low resource consumption through reuse of existing equipment
  • International Engineering – Delivery and service worldwide